NASCLA plan-reading drill 2: foundations, roof framing and ceilings

Read three more original practice sheets, a foundation plan, a roof framing plan and a reflected ceiling plan, and answer 30 questions on scale, takeoff, schedules and coordination conflicts.

Three practice sheets · 30 questions

NASCLA plan-reading drill 2

See all three sheets ↓

Each question shows the sheet it is about. Read the answer off the drawing, its dimensions, tags and schedules, and work any arithmetic. Some questions ask you to find where two parts of the set disagree. Every answer shows the working and what each wrong option got wrong.

Set 20261107 · 0 of 30 answered · 0 correct

Question 1 of 30 · sheet M-101

OPEN OFFICE101CONFERENCE 102BREAK 1032x2 ACT AT 9'-0"2x2 ACT AT 9'-0"GYP. BD. AT 8'-6"LASD-1RG-1EXLBLBRG-1SD-1LCSD-264'-0"40'-0"24'-0"40'-0"20'-0"20'-0"NFIXTURE SCHEDULETYPESYM.DESCRIPTIONWATTSLA2x4 LED TROFFER, RECESSED40 WLB2x2 LED TROFFER, RECESSED30 WLC6 IN LED DOWNLIGHT15 WEXEXIT SIGN, CEILING MOUNTED3 WDIFFUSER SCHEDULEMARKSYM.TYPEFACENECKCFMSD-1SUPPLY, 4-WAY LOUVERED24 x 2410 IN ROUND250SD-2SUPPLY, 4-WAY LOUVERED12 x 128 IN ROUND150RG-1RETURN, PERFORATED24 x 2422 x 22-CEILINGS: 2x2 ACT AT 9'-0" A.F.F. UNLESS NOTED.RTU-1 ON ROOF: 2,000 CFM SUPPLY TO THE DIFFUSERS ON THIS SHEET.DIMENSIONS ARE TO WALL CENTERLINES.ACT = ACOUSTICAL CEILING TILE · GYP. BD. = GYPSUM BOARDA.F.F. = ABOVE FINISHED FLOORPRACTICE DRAWING, INVENTED FOR STUDY. NOT FOR CONSTRUCTION.REFLECTED CEILING AND MECHANICAL PLANSCALE 1/4 IN = 1 FT ON A FULL-SIZE PRINTM-101
Text description of sheet M-101

Practice sheet M-101, reflected ceiling and mechanical plan, scale 1/4 in = 1 ft on a full-size print, same building as S-101. Dimensions are to wall centerlines. Open office 101 is 40'-0" east to west by 40'-0" north to south, ceiling 2x2 ACT at 9'-0" above finished floor, and holds 20 LA, 2 EX, 6 SD-1 and 2 RG-1; Conference 102 is 24'-0" east to west by 20'-0" north to south, ceiling 2x2 ACT at 9'-0" above finished floor, and holds 5 LB, 2 SD-1 and 1 RG-1; Break 103 is 24'-0" east to west by 20'-0" north to south, ceiling GYP. BD. at 8'-6" above finished floor, and holds 6 LC and 1 SD-2. Open Office 101 is the west part of the building; Conference 102 is the northeast room and Break 103 the southeast room. In Open Office 101 the LA troffers run in 4 rows of 5, the SD-1 diffusers in 2 rows of 3, and the two RG-1 grilles sit on the middle line. In Conference 102 an LB sits in each corner area, and one LB and one RG-1 are both drawn in the same center tile, 52 ft east and 10 ft south; the SD-1 diffusers sit north and south of it. Break 103 has 2 rows of 3 LC downlights and one SD-2 in the middle. Fixture schedule: LA, 2x4 led troffer, recessed, 40 W; LB, 2x2 led troffer, recessed, 30 W; LC, 6 in led downlight, 15 W; EX, exit sign, ceiling mounted, 3 W. Diffuser schedule: SD-1, supply, 4-way louvered, face 24 x 24, neck 10 in round, 250 CFM; SD-2, supply, 4-way louvered, face 12 x 12, neck 8 in round, 150 CFM; RG-1, return, perforated, face 24 x 24, neck 22 x 22, no CFM listed. Mechanical note: RTU-1 on the roof supplies 2,000 CFM to the supply diffusers on this sheet. ACT = acoustical ceiling tile, GYP. BD. = gypsum board, A.F.F. = above finished floor.

On a full-size print of this sheet, CONFERENCE 102 measures 6 in east to west. How wide is it?

This is the second set of practice sheets. The first plan-reading drill covers a floor plan, a wall section and a site plan; this one adds the structural and ceiling sheets, where most takeoffs come from schedules, and asks you to catch where the sheets disagree. For what the bulletin does and does not say about the packet handed out at the test center, read the NASCLA diagram and blueprint packet guide.

How the drill works

Each set serves all 30 questions in a shuffled order, with the four options shuffled too. Each question shows the sheet it is about, and every sheet has a text description with all of its values, so you can work it without seeing the drawing. On a phone the sheet runs the full width of the screen; tap a sheet or its zoom button to read it at twice the size, then drag to move around it. Check your answer and the explanation shows where on the sheet to look, the arithmetic worked twice, and the slip behind each wrong option.

Your score is one point per question, out of 30. At the end you see your misses by skill: scale and dimensions, quantity takeoff, schedule lookup, coordination conflicts. Hit New shuffle for a fresh order. Use the set number if you report an error.

Worked examples

Example 1: the concrete in footing F3

Step 1: find the tag on the plan. F3 sits under the column at grid B-3. Step 2: read its row in the footing schedule, 6'-0" x 6'-0" x 18". Step 3: turn every dimension into feet and multiply, 6 x 6 x 1.5 = 54 cubic feet. Step 4: divide by 27, 54 ÷ 27 = 2.0 cubic yards. Check it another way: 36 square feet of plan area x 1.5 ft = 54, and 27 x 2 = 54.

Example 2: checking a dimension string

Step 1: read the west string on S-101, 20'-0" and 20'-0". Step 2: add it, 20 + 20 = 40. Step 3: compare it with the overall dimension, 40'-0". They agree. Check it against the grid: lines A, B and C are 20 ft apart, so the string and the grid tell the same story. Do this for every string before you take off from it. When a string and its overall disagree, write down both numbers and ask with a request for information (RFI). Do not pick the one that suits your bid.

The three practice sheets

Every sheet is invented for study and labeled as a practice drawing. All three show the same 64 ft by 40 ft building on the same grid, so you can check one sheet against another. The scale notes hold on a full-size print only, so use the written dimensions.

Practice the arithmetic behind the takeoffs with the concrete yardage calculator and the roofing squares calculator. For a floor plan, a wall section and a site plan, go back to the first plan-reading drill. The NASCLA exam outline shows how the twelve subject areas are weighted.

Ready for more? The third plan-reading drill has three more sheets for one building, a building section, a site utility plan and an electrical and fire protection plan, with 30 questions on elevations, pipe slopes and inverts, schedules and the conflicts between sheets.

NASCLA plan-reading drill 2 FAQ

Are these sheets like the packet handed out at the test center?

We cannot say, and we do not claim they are. PSI's bulletin lists a physical diagram/blueprint packet to be handed out onsite at the testing center and says nothing about what is in it. We have not seen it. These three sheets are our own invented practice drawings, built to practice reading drawings in general.

Why do some sheets have mistakes on them?

On purpose. Six questions ask you to find where a sheet disagrees with itself or with another sheet: a dimension string that does not add up, a tag with no schedule row, a callout that differs from its schedule, a count that differs from its spacing, a supply total that differs from the unit, and two items drawn in one tile. Real drawing sets carry slips like these. The habit is to check, write down both numbers and ask, not to pick one.

How do I read the sheets on a phone?

Each sheet runs the full width of the screen and is drawn so its text is close to full size there. Tap a sheet or its zoom button to read it at twice the size, then drag to move around it. Every sheet also has a text description with all of its values. Do not measure the screen: the scale notes hold only on a full-size print, so questions that need a measurement give it to you.

30 original questions on three invented practice sheets for one building: a foundation plan with a footing schedule, a roof framing plan with a member schedule and a reflected ceiling plan with fixture and diffuser schedules. Every answer comes from the drawing alone, is worked twice and says what each wrong option got wrong. No exam item or reference text is used.

Try one free question

Try one question

Question 1 of the free 10-question check on NASCLA Commercial. No signup. Then ask Seal, the AI study assistant, why the answer is right and the others are wrong.

Question 1 of 10 · free checkUntimed

Procurement and Contracting Requirements

A subcontractor on a bonded public project has not been paid for completed work. Which bond is meant to protect it?

Press A-D or 1-4 to choose an answer while this question is on screen.

Choose an answer to begin

Free NASCLA Commercial study plan

A week-by-week plan from today to your exam, weighted to the published exam outline. We show it here and email you a copy.

Ask Seal before you buy AI your AI study assistant

See what's on the NASCLA Commercial exam, test yourself with 5 quick questions, or find the plan that fits you.

Sources

From the blog

Preparing for the NASCLA Commercial exam?

Plan reading is one skill; the twelve subject areas are the rest. The free 10-question check scores you by subject area in minutes, no signup. The Bid Bond course then has a lesson for each of the twelve areas that shows which listed reference to open and how to apply it.

Take the free 10-question check

The NASCLA Commercial course

Available now · instant access

The NASCLA Commercial course

  • 12modules of lessonsEvery task on the outline
  • 4full-length timed exams115 questions in 330 minutes each
  • 472practice questionsEach one explained
  • 1week-by-week study planSet to your exam date

Turn a practice answer into a study step. In untimed practice, ask Seal AI about any question you answer, follow up, then see your weakest topics and what to drill next.

NASCLA Commercial course$199

Terms and refunds · Secure checkout by Stripe · Billed by Nori Software

See the course

Compare plans

Every answer comes with a full explanation.

By the Bid Bond editorial team. Report an error with the set number and question number.